Service Telephone:+86-132-80757591
PP/HDPE Geogrid
PP/HDPE Geogrid

PP/HDPE Geogrid

More Information

  1. Payment Terms: T/T, L/C At Sight
  2. Package:Pallet Packing or as customer requier
  3. Minimum Order: 1 Unit
  4. Delivery Time: 15 Days - 30Days
  5. Export Markets: North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

The Product Description of PP/HDPE Geogrid


It is mainly used in highway and railroad to reduce the subsiding difference ofthe roadbed and bridgehead, lower the vibration of the vehicles and theroadbed, slower the roadbed structure distortion to guarantee the security and comfort. To lay the geogrid in the backfill soil can increase the shearing strength and the whole character in middle terms, reduce the mid-term filling quantity, make the soft base more convenient, lower the construction cost.When used in the dam design, it can be as the muscle structure to improve the bearing distortion performance of the dam to avoid breaking.

 

Mail Consultation
Try another code
Click it,change a Code